Commitment To Quality
Quality Control Step 1: Raw Material Selection
Good raw materials are the foundation of everything. We have to choose more reliable raw materials suppliers.
Aluminum zinc coating is further optimized on the basis of galvanization technologyan,it has important protection for steel oxidation process, which can effectively prevent the rust reaction of steel surface. The thicker the coating, the longer the protection time. The current coating technology can reach the thickness of 150g/m2, which can effectively protect the steel plate surface from rusting for 30 years in general environment.
Cutting side protection: 150g/m2 Al-Zn-Mg Coating
PVDF Painting: 15-30 Years no fading issue
15-30 Years no fading: High temperature sintered colored stone
Fingerprint Resistant technology
Without strict production process control, even the best raw materials will not give full play to their optimal performance.
Cutting
Cut the raw material aluminum zinc steel coil into appropriate tile size, it is important whether the cutting surface is smooth. Thesmoother cutting side section is not easy to rust.
Trimming
After the size is cut, the cut aluminum zinc plated steel plate lace shall be cut. Still whether the cutting surface is smooth is veryimportant. The smoother cutting side section is not easy to rust.
Pressing
The hydraulic pressing process needs to ensure the integrity and beauty of the tiles. This process needs to strictly control the strengthand speed of the molding machine. it is easier for inexperienced factories to fracture the plates, f the cracked tiles are installed on theroof, it will cause rain leakage and big losses to customers.
Stone bonding
In this process, resin adhesive shall be sprayed and sand blasted for initial drying, and then the color stone shall be uniformly pastedon the base plate after sand blasting and baking.
Surface Glue
The function of spraying surface glue is to further consolidate the firmness of stone bonding, isolate the stone from the outside air.
and ensure that as little water as possible seeps into the ground glue layer when it rains.
Baking
The temperature change and duration of drying are crucial. A specific temperature is required for glue chain reaction. The correcttemperature and time can ensure the optimal bonding performance and the weatherability of tiles in later use.