ExportHub
icon-left
ExportHub ExportHub
icon-right

Scaling Up Efficiency: The 115mm O2 Rock Blasting Tube For Large-scale Projects

销售价格: Negotiable
起订量:  3000 Meter
装运交货时间:  15 days
装运港口:  Qingdao
货币期权:  USD,EUR,CNY
语言支援:   English, Chinese
资质认证:  询单
产品生产量: 30000meter/month Meter
主营业务:  制造商/工厂
打包:  normal packaging
首选付款方式:
Scaling Up Efficiency: The 115mm O2 Rock Blasting Tube For Large-Scale Projects 细节

Let's address some common questions about the 115mm tube:

Q: What's the advantage of using a 115mm tube over the 90mm tube?

A: The 115mm tube allows for wider borehole spacing – 3 meters compared to 2.5 meters for the 90mm tube. This means fewer boreholes are needed for the same area, significantly reducing drilling time and labor costs. The savings in labor often outweigh the slightly higher cost per 115mm tube, especially on large projects.

Q: How much rock can one 115mm tube blast?

A: The blasting volume depends on factors like tube length (up to 3 meters for a 6-meter borehole), rock type, and borehole spacing. However, the wider spacing with the 115mm tube still provides significant cost savings per cubic meter, maintaining our competitive $1/m³ average.

Q: Is the 115mm tube more expensive?

A: Yes, the individual cost is higher than the 90mm tube. But the reduced labor and drilling time often result in significant overall cost savings, particularly on large projects where the number of boreholes is substantially reduced.

Q: How does the 115mm tube work with the O2 system?

A: The process remains the same: precise drilling, tube insertion, connection to the gas filling tank, liquid oxygen filling, backfilling, safety precautions, remote activation, and final inspection. However, careful planning of borehole placement is crucial to maximize efficiency with the wider spacing.

Q: What types of projects benefit most from the 115mm tube?

A: Large-scale quarry operations, extensive mining projects, and large-scale infrastructure developments where minimizing borehole density is key to efficiency and cost-effectiveness.

Q: What about safety?

A: Safety remains paramount. The controlled expansion of liquid oxygen minimizes shockwaves and flyrock, even with the increased blasting radius of the 115mm tube. Our rigorous safety protocols remain unchanged.

Using the 115mm Tube:

The 115mm tube integrates seamlessly into the O2 rock blasting system. However, careful planning of borehole placement is essential to maximize the benefits of the wider spacing. Our engineering team will work closely with you to develop a tailored plan that optimizes both efficiency and safety.

Conclusion:

The 115mm O2 rock blasting tube is a powerful tool for large-scale projects. While the individual tube cost is higher, the substantial reduction in labor, drilling time, and overall project costs makes it the most efficient and economical solution for many large-scale operations. Contact us to discuss how the 115mm tube can help you optimize your next project.

关于 Yantai Gaea Rock Split Machinery Technology Co.,ltd
业务类型: 制造商/工厂
国家/地区: Shandong, 中国
主要产品: Rock Demolition Equipment...
年总收入: 不提供
成立时间: 2025
业务性质

制造商/工厂

成立年份

2025

国家/地区

烟台, 中国

主要产品

Rock Demolition Equipment...

付款条件

Doc Against Acceptance (D/A), Doc Against Payment (D/P), Letter of Credit (L/C), Bank wire (T/T)

关于 Yantai Gaea Rock Split Machinery Technology Co.,Ltd

将您的询问直接发送给该供应商

至: Scaling Up Efficiency: The 115mm O2 Rock Blasting Tube For Large-scale Projects
从 中国
免费会员
业务类型:
制造商/工厂
评分:
Not Available
响应:
93%
交易次数:
无法使用
No.1, Zhishui South Street, Zhifu District, Yantai City , 山东 , 烟台 , 中国

联系 Yantai Gaea Rock Split Machinery Technology Co.,Ltd

消息发送成功!!您的留言已成功发送.

消息发送成功!!您的查询已成功发送.

加载中

您的留言已成功发送.

exporthub-newcontact-with-inquiry

* 我同意ExportHub, 的服务 条款, 隐私政策, IPR / DMCA 政策 和营销政策 出口中心

Submitting...
ExportHub虚拟博览会
滚动到顶部